Kishau Multi Purpose Project

Kishau Dam Project would utilize the water of river Tons which is a major tributary of river Yamuna and forms boundary between Himachal Pradesh and Uttarakhand in most of its reaches in this region. The water stored in the Kishau reservoir shall be utilized for irrigation, power generation and to augment drinking water supply for National Capital Delhi.

The project with a proposed installation of 660 MW (4 x 165 MW) is envisaged to generate an annual energy generation of 1851.51 MU in a 90% dependable year.

Mou has been singned between GoU & GOHP for implematation of the project throught a joint venture having equal benifits for both the states.


Photo: Dam Site

Salient Features :

· Location - Dehradun, Uttarakhand

· River – Yamuna

· Capacity - 660 MW

· Concrete Gravity Dam - 236.0 m high

· Pressure shaft - Dia 5.0 m, 410.0 m long circular 4 Nos.

· Surface power house - at the toe of the Dam on the left bank

· Generator

4 units of 165 MW each

· Vertical Francis Turbine - 4 Nos.

· Design head - 186.00 m

· Submergence area in Uttarakhand and Himachal Pradesh - 2950 Ha

· Annual Generation - 1851.51 MU

· Project Cost - Rs. 7193.23 crore on June, 2010 PL

· Year of Commissioning/Completion Schedule - Mar 2027

 
 