Sl. No. |
Objective |
Initiatives Taken |
Status |
|
1 |
IT Connectivety at
Yamuna
Valley and Uttarkashi area Offices to be
established. |
The WAN Project for
connecting Yamuna Valley Plants and
Uttarkashi Offices, awarded to M/s ITI was
completed. |
Work Completed and
Connectivity established over BSNL Lease
Lines. Chhibro Power Plant will be connected
to UJJWAL over WAN after BSNL installs lease
line between these locations |
|
2 |
IT Systems at UJVNL to be
augmented to make those at par with any
modern hydro-power company
|
A visit was undertaken to
understand the IT setup of NHPC at its HO at
Faridabad that gave a insight on what could
be the IT set-up of UJVNL |
The findings of this visit
were studied and it was decided that a
Project like approach to augment IT
Infrastructure will be yielding results
faster and with more predictability. Also a
Turnkey Project will be favourable than
piece meal work. |
|
3 |
Planning for augmenting IT
Infrastructure to make IT as Strategic
Business Driver. |
A System study for Augmenting
IT Infrastructure of UJVNL and Pilot
Implementation of HR Applications was
awarded to M/S NIIT. The System Study has
been completed. |
The Technical Solution for
Establishing Data Centre at UJJWAL has been
completed. The Bill of Materials, Phasing
Plan and Costing has been done. After
approval of the Management, Tendering will
be done for Establishing Data Centre at
UJVNL. |
|
4 |
Web based Tender Publishing
System in Vogue at UJVNL to be converted to
full fledged e-tendering |
A Pilot Project was awarded
to M/s ITI for processing two Tenders
through e-tendering. |
One tender has been processed
using e-tendering. The findings are not in
favour of going full-fledged e-tendering
system. |
|
5 |
Internet access to be made
effective |
The Internet Port with 512
KBPS capacity, has been upgraded to 4
MBPs(1:4) capacity for better accessibility
of Internet to remote locations connected
over WAN. |
The Internet Port has been
upgraded and is fully functional |
|
6 |
Voice and Data Communication
Infrastructure to be made high speed and
fault tolerant |
M/s BSNL has been provided
space on lease in UJJWAL for setting-up
Microwave Tower/ BTS, so that Internet Port
and WAN Connections can be taken on OFC. |
The BSNL has started the
work. The Tower has been erected. The
facility is expected to be functional in 6
months time. |
|
7 |
Enhancements in e-Payroll
Application for disbursing Salary as per 6th
pay commission recommendations |
A war-footing initiative was
taken-up to disburse Salary of April 2009
paid in May 2009 after the Office Order for
Implementation of 6th Pay
Commission Recommendations was passed in Mar
20, 2009. |
The time was very very short.
With great difficulty and highly co-ordinated
team work, the salary disbursement has been
achieved in the stipulated timeframe.
|
|
8 |
Implementation of Internet
based File/Letter tracking System) at UJVNL |
A joint initiative was
taken-up with the help of NIC to implement
e-patravali at UJVNL. |
The software has been
implemented in Director (Finance) Office and
is operational.
Due to
difference in the pre-developed software of
NIC and UJVNL requirements, major changes in
the software were made, in line with the
requirements of UJVNL.
User feed-back is regularly
being monitored and changes are being made
in software.
After implementation and
acceptance of this software in Director
(Finance) Office, it will be implemented in
other offices. |
|
9 |
Value Engineering Study by
M/S SAP for Implementation of IT
Initiatives in UJVNL |
A Study has been awarded to
M/s SAP to examine the present State of
UJVNL vis-à-vis the peers and to recommend
an IT Initiative for UJVNL with tangible
benefits. |
The Draft Report on the
findings has been submitted by SAP is under
examination. Subsequently a presentation
will be made by SAP explaining the findings.
A Final Report will be submitted later. The
Findings will be used for Development of IT
Infrastructure that will drive business of
UJVNL. |