The power station
is located on the downstream of the Dhakrani
Power House at a distance of 4km on the power channel which takes off
from the Dakpathar Barrage. The power plant was
commissioned in the year 1965. The surface Power House comprising 3
units of 17 MW each with Francis turbines of 24,000 HP output is
located on the power channel and the water from the tail race flows
into Asan river. The Power Station's Design
Energy is 192 MU with a design head of 30.48 m.

The Dhalipur power
station is a low head scheme located on power channel with a design
discharge of 199.2 cum.The
Plant has shown significant improvements in generation since 2000.
The year 2004-05 was a draught year and more so for the Yamuna valley.
UJVNL proposes to
carry out the M&U of the power station which is estimated to cost Rs. 101.25 crore. The
major M&U works proposed are:-
i) Provision of Micro-processor
based Governors.
ii) Provision of Static excitation equipments and On-line
monitoring equipment.
iii) Modernization of Communication, Test & Control,
Protection & Instrumentation, switchyard equipment, hydro
mechanical equipment etc.
iv) Desilting of Asan
Barrage for storage.
v) Improvement in the efficiency of Generators and Turbines.
The M&U works after completion would increase the generation to 250
MU besides life extension of the plant. The works are expected to be
completed by 2011-12.
|
Year
|
2004-05
|
2005-06
|
2006-07
|
2007-08
|
2008-09
(Upto Nov-08)
|
|
Generation(MU)
|
185.33
|
236.14
|
214.28
|
210.70
|
192.29
|
 |